Strategic Investment Overview in PIC 


Oversized, modern, and operational infrastructure


Private electrical substation (n+1)​: 3 × 40 MVA, 115/34.5 kV

Potable water:  50 liters per second (L/s)

Wastewater treatment plant: facility to provide you with environmental safety, operational savings, and regulatory assurance

from the outset.

Redundant industrial fiber optic: multiple rings, low latency, guaranteed bandwidth.

Industrial natural gas: direct connection to the gas pipeline, regulated pressure.

Industrial road network: pavement for heavy traffic, sidewalks, signage, LED lighting.

Security systems: HD CCTV, biometric access, mobile patrols 24/7.


Strategic Location with Industrial Impact 


Centenario Industrial Park is located in the logistical heart of northern Mexico, within the metropolitan area of Torreón, Coahuila. 

This location offers direct connectivity to highways, railroads, and key airports, reducing logistics times and costs for national and international operations. It is the ideal spot for companies looking to scale quickly, optimize their supply chain, and take advantage of nearshoring benefits. 

Strategic Location Brochure

Tangible Advantages for Your Decision

Centenario Industrial Park guarantees a quick start and smooth operation.

Thanks to our prior urbanization phase and pre-approved permits, your project can start operations within 4-8 weeks, compared to the 6-12 months typically required for conventional construction. This translates into generated income and anticipated cash flow, significantly shortening your investment recovery period.


We agreed on a "turnkey" development package with completely transparent capital costs (CAPEX): from earthworks to the delivery of the facility. Additionally, our critical services (energy, water, treatment, security, maintenance) operate under fixed-rate contracts, minimizing the variability of operating expenses (OPEX) and facilitating your financial projections.


Expansion phases to grow without interrupting your operation

Our phased development (I, II, and III) allows you to expand your facility whenever you need, without dismantling your current operation. Each land module and each new phase have the same quality of infrastructure and redundant services, ensuring that your growth is continuous and without technical stops or internal relocations.


We sign your leases and service contracts in US dollars or indexed pesos, with clear adjustment clauses. This structure mitigates exchange rate risks and provides you with the certainty of a long-term commitment with predictable payment and renewal conditions.


Strategic Expansion


Our development progresses in three clearly defined phases to adapt to your operational and growth needs:

Phase I: 100 fully urbanized hectares

Ready for inmediate occupancy with 30 lots totalling 93.16 hectares of available land.

100%

Phase II: 106 acres in the process urbanization

With 18 projected lots (88.13 ha) currently in the process of infrastructure installation, delivery subject to progress and demand.

0%

In the process of urbanization...

Phase III: 100 hectares planned for 2026

Targeted of high-value sectors (aerospace, data centers), it includes 16 lots (72.88 ha), designed for high energy availability, redundant connectivity, and specialized environmental control.

0%

Very soon in 2026