In this exclusive report, we present the six key factors that make Torreón the optimal location for your industrial facility. Precise information, quantitative data, and strategic advantages to accelerate your project from day one.
1. Strategic Location in La Laguna
- Heart of the Northern Corridor: Just 15 km from the Coahuila–Durango border, with direct access to central and northern Mexican markets.
- Proximity to Key Clusters: Within 300 km of San Luis Potosí and Saltillo, placing you inside the fastest-growing industrial triangle in the country.
2. Multimodal Connectivity
- High-capacity highway network: Toll roads to Monclova, Saltillo, and Monterrey with transit times of just 4–6 hours.
- Rail access: Ferromex and KCS rail lines connect directly to dry ports and major distribution hubs.
- Plan de Guadalupe International Airport: Air cargo and passenger terminal with daily flights to Mexico City and connections to Guadalajara.
3. Class-A Industrial Infrastructure
- Construction-ready lots: Leveled land with installed drainage, potable water, and natural gas networks.
- Reliable energy: Local substation with N+1 redundancy and >99.9% availability.
- Digital connectivity: Dual-route fiber optics with ≥99.95% SLA to support 24/7 operations.
4. Local Talent & Educational Ecosystem
- Key institutions: ITO, ITESM Laguna, and Universidad Iberoamericana graduate over 5,000 engineers and technicians annually in logistics, mechanical engineering, and automation.
- Workforce development: Internship programs, job boards, and continuous training in Lean Manufacturing and Six Sigma.
5. Operating Costs & ROI Potential
- Competitive TCO: Up to 18% savings in energy and labor vs. U.S. maquiladora hubs.
- Industrial land price: Starting at USD 85/m², compared to USD 110/m² in Texas border zones.
- Project startup time: Build-to-suit infrastructure ready in under 8 weeks.
6. Quality of Life & Local Incentives
- Executive lifestyle: Modern housing developments, top-tier healthcare, and cultural amenities for executives and families.
-
Municipal incentives:
- Up to 3 years of property tax exemptions
- University–business linkage support
- Subsidized training programs (up to 60% of total cost)
👉 Schedule your on-site visit to Torreón and discover Parque Industrial Centenario. Receive a custom feasibility report including ROI analysis, incentive review, and a tailored implementation plan.